☎ (912) 346-3621

Bathroom Remodeling in Savannah, GA

Full bathroom renovations — tile, vanities, fixtures, showers, tubs, and flooring. One crew handles everything from demo to final walk-through.

Get a Free Estimate →

Your dream bathroom, built by us.

Shower Tile

Custom tile showers with waterproof membranes and clean grout lines.

Vanity Installation

Single and double vanities with countertops, sinks, and faucets.

Tub Replacement

Old tubs removed and replaced with modern soaking or walk-in models.

Fixture Upgrades

Faucets, showerheads, towel bars, and lighting updated to modern styles.

Floor Tile

Bathroom floor tile installed with proper slope and waterproofing.

Full Renovation

Complete gut-and-rebuild bathroom remodels from layout to finishing touches.

The Brayan Painting and Remodeling difference.

One Crew, Start to Finish

No subcontractors — our team handles every trade.

Waterproof Systems

Kerdi and RedGard waterproofing on every shower.

On-Time Delivery

We know you need your bathroom back — we work efficiently.

Licensed & Insured · Certificates available on request

Questions we hear in Savannah.

How much does a bathroom remodel cost in Savannah?

It depends on scope. A refresh with a new vanity, fixtures, and paint usually lands between $6,000 and $12,000. Tub-to-shower conversions with new tile typically run $9,000 to $18,000. Full gut renovations of a primary bath in Savannah commonly fall between $20,000 and $45,000, with tile selection and plumbing relocation driving most of the swing. A free estimate locks in a real number.

How long will my bathroom be out of commission?

Plan on 3 to 5 working days for a vanity-and-fixture update, 1 to 2 weeks for a shower tile job, and 3 to 5 weeks for a full renovation. Because one crew handles demo, tile, plumbing fixtures, drywall, and paint, you avoid the gaps between subcontractors that stretch many Savannah remodels into months.

Why does waterproofing matter so much in coastal Georgia?

Savannah humidity means a bathroom rarely dries out completely between showers. Without a proper waterproofing membrane behind the tile, moisture creeps into the framing and shows up later as soft drywall, mold, or loose tile. Every shower we build gets a waterproof system under the tile, not just cement board and hope.

Do I need a permit for a bathroom remodel in Chatham County?

Swapping a vanity, faucet, or toilet in the same spot usually does not require a permit. Moving plumbing, adding electrical circuits, or changing walls does, whether you are in Savannah, Pooler, or Richmond Hill. We will tell you up front which category your project falls into and handle the paperwork when a permit is required.

Is it worth remodeling or should I just replace the fixtures?

If the layout works and the tile is sound, a fixture-and-vanity refresh gives you most of the visual payoff for a fraction of the cost. A full remodel makes sense when there is water damage, a cramped layout, or an old tub nobody uses. You get an honest recommendation on which one your bathroom needs during the free estimate.

Ready to get started?

Free estimates, no pressure, usually same-day reply.

Prefer to talk? Call or text (912) 346-3621

Call NowFree Estimate